Construction of the I-495 Virginia HOT Lanes is divided into four construction areas:
For construction details on a specific interchange or overpass in this area, please click on one of the links below:
- Lewinsville Road
- Dulles Toll Road
- Jones Branch Drive
- Westpark Drive and Route 123 (Chain Bridge Road)
Fact Sheet | Presentation | Ramp Closure Fact Sheet - Route 7 (Leesburg Pike)
Fact Sheet | Presentation
I-66 Interchange/Merrifield
view details »
For construction details on a specific interchange or overpass in this area, please click on one of the links below:
- Oak Street and Idylwood Road
Fact Sheet - W&OD Trail Pedestrian Bridge
- I-66
Fact Sheet - US 29 (Lee Highway)
Fact sheet | presentation
Beltway South of I-66 Interchange
view details »
For construction details on a specific interchange or overpass in this area, please click on one of the links below:
- Route 50 (Arlington Boulevard)
fact sheet presentation - Gallows Road
fact sheet | presentation - Route 236 (Little River Turnpike)
fact sheet | presentation - Pedestrian Bridge to Wakefield Park
fact sheet - Route 620 (Braddock Road)
fact sheet | presentation
Springfield Interchange
view details »
Construction in this area includes the continuation of the Springfield Interchange Improvement Project. Improvements to the Springfield Interchange will provide a seamless integration with HOV service on I-95/395 and the Capital Beltway once HOT lanes construction is complete.
|
2007 - 2009
Design and Engineering
2008
Aerial Study
Spring 2008
Design Public Hearing
2008 - 2010
Right of Way Activity
|
2008 - 2009
Cleaning and Grubbing
2008 - 2010
Utility Relocation
2008 - 2011
Soundwall Relocation / Construction
2008 - 2012
Bridge Construction
|

